Smart Irrigation Modernisation
All projects

Agriculture & Food Security · East Java, Indonesia

Smart Irrigation Modernisation

Upgrading canal-fed irrigation for 4,800 hectares of rice and horticulture with metered offtakes and solar pumping.

Year
2025
Duration
30 months
Status
In progress
Our role
Owner’s engineer
4,800 hacommand area
62metered offtakes
1.9 MWpsolar pumping

The challenge

Ageing canals were losing much of their flow before reaching farms, and the funder required measurable water savings and transparent reporting before releasing later tranches.

Our approach

Acting as owner’s engineer, SEYA Projects reviews designs, supervises the local contractors and reports progress to the agency and funder. Metered offtakes and solar pumping stations feed a simple dashboard used by the water-user associations.

Scope of work

  • Design review
  • Contractor supervision
  • Quality & HSE oversight
  • Solar pumping stations
  • Flow metering
  • Funder reporting

Timeline

  1. Baseline surveyQ1 2024
  2. Design reviewQ2 2024
  3. Phase 1 worksQ3 2024 – Q4 2025
  4. Phase 2 works2026