Grid Substation & Transmission Connection
A 150/20 kV substation and 18 km transmission line connecting a new renewable plant to the national grid.
- Year
- 2025
- Duration
- 22 months
- Status
- In progress
- Our role
- Owner’s engineer
150/20 kVsubstation
18 kmtransmission line
On-timegrid energisation
The challenge
The plant could not monetise generation until a compliant grid connection and substation were energised, under the utility’s technical and permitting requirements.
Our approach
SEYA Projects reviewed the connection design, managed the EPC contractor, witnessed factory and site acceptance tests and coordinated energisation with the utility.
Scope of work
- Connection design review
- EPC management
- Right-of-way & permitting
- Protection & SCADA
- Factory & site acceptance tests
- Energisation
Timeline
- Design & permits2024
- ConstructionQ1–Q4 2025
- Testing & energisationQ1 2026