Critical Infrastructure · Johor, Malaysia
Security Master Plan for a Data-Centre Campus
Layered physical and cyber security design for a 48 MW campus, from perimeter to data hall.
- Year
- 2025
- Duration
- 5 months
- Status
- Completed
- Our role
- Security consultant
48 MWcampus
5security layers defined
2anchor tenants approved design
The challenge
Hyperscale tenants required evidence of a security design meeting their standards before signing leases.
Our approach
SEYA Security & Intelligence led the threat assessment and security master plan; SEYA Tech covered converged physical–cyber controls; SEYA Projects aligned the design with the construction programme.
Scope of work
- Threat & risk assessment
- Security master plan
- Perimeter & access design
- Converged security
- Tenant audits
Timeline
- AssessmentMonth 1
- Concept & master planMonths 2–4
- Tenant reviewMonth 5