Island Solar-Storage Microgrid
All projects

Energy & Utilities · Nusa Tenggara, Indonesia

Island Solar-Storage Microgrid

A 6 MWp solar plant with 8 MWh battery storage that cut diesel use on an island grid.

Year
2025
Duration
16 months
Status
Completed
Our role
Owner’s engineer
6 MWpsolar
8 MWhstorage
-58%diesel consumption

The challenge

The island depended on diesel generation. The producer needed independent oversight of an EPC contractor and proof that the hybrid system would keep the grid stable.

Our approach

SEYA Projects reviewed the design and grid studies, witnessed factory and site tests, and supervised construction through to reliability-run completion.

Scope of work

  • Design & grid-study review
  • Factory acceptance tests
  • Construction supervision
  • Reliability run
  • Lender reporting

Timeline

  1. Design reviewQ1 2024
  2. ConstructionQ2 2024 – Q1 2025
  3. Testing & reliability runQ2 2025